Four jobs from the last two years, including what we found once we opened them up.
Devonport · 2026
Forty-odd fittings and six switch banks retrofitted without lifting the original floors.
Takapuna · 2025
Sixty square metres of engineered timber over a floor that needed levelling first.
Birkenhead · 2025
Three bedrooms, two living areas and all the trim, done around a family still living in it.
Milford · 2024
A stain on a downstairs ceiling that two previous visits had blamed on the shower.